Filed Under:
HeritageApril 21st, 2010

Restoration of this 100 year old historic covered market was carried out under a preservation order. Inspection showed 24” to 48” fractures in six of the cast iron architectural columns supporting the roof. As it was virtually impossible to replace the columns without a total stripdown, a repair was essential, avoiding the shortcomings of welding. The Metalock repair required no dismantling, was guaranteed and approved by Lloyd’s.
Filed Under:
HeritageDecember 5th, 2009
The Palm House forms an integral part of the structure of Kew Gardens, and is being renovated as part of the overall restoration programme. The sills, guttering and floor plates,
PRESS RELEASE
November 18th, 2009
Using its orbital turning equipment and expertise Metalock Engineering UK has saved Lafarge Cement a great deal of downtime and expense by recovering in-situ a large diameter journal that had
Read more about Lafarge Cement Mill Shaft Restorations
Contact:
Metalock Engineering UK Ltd.
Unit H5 Pilgrims Walk, Prologis Park, Coventry CV6 4QG ENGLAND
Tel: +44 (0) 2476 338205
Fax: +44 (0) 2476 360190