Filed Under:
HeritageApril 21st, 2010

Restoration of this 100 year old historic covered market was carried out under a preservation order. Inspection showed 24” to 48” fractures in six of the cast iron architectural columns supporting the roof. As it was virtually impossible to replace the columns without a total stripdown, a repair was essential, avoiding the shortcomings of welding. The Metalock repair required no dismantling, was guaranteed and approved by Lloyd’s.
Filed Under:
HeritageApril 10th, 2010
Following a crack detection survey by Metalock to the cast iron columns of the pier, originally constructed in 1862, Worthing Borough Council commissioned the company to repair the columns under
Read more about Worthing Pier Repair
Filed Under:
HeritageMarch 30th, 2010
Lacey Green Windmill is thought to be the oldest surviving smock mill and the third oldest windmill in the British Isles. The machinery it still contains could be that which
Read more about Lacey Green Windmill
Filed Under:
HeritageMarch 20th, 2010
Built 166 years ago, the Aqueduct at Wootton Wawen was damaged by a heavy road vehicle, causing a 3 foot fracture in a cast iron tray. As it carried the
Read more about Wootton Wawen Aqueduct
Filed Under:
HeritageMarch 10th, 2010
Visitors to Brighton who will recognise and appreciate the iron terrace built in 1895 will be pleased to learn that Brighton Corporation were able to save the structure with the
Read more about Madeira Terrace
Filed Under:
HeritageMarch 1st, 2010
A famous landmark in Central London, the 100 year old Charing Cross Bridge carries 123,000 commuters across the Thames by rail each day. 720 feet of cracks to the structure’s
Read more about Charing Cross Bridge London
Filed Under:
HeritageFebruary 20th, 2010
Historical Name Plate suffers damage and is repaired by the Metalock process thus retaining its originality.
Read more about Head Ashby & Co Name Plate
Filed Under:
HeritageJanuary 30th, 2010
The scourge of low cast iron bridges are high sided vehicles coming into contact with the structures, causing major damage. Metalock are able to replace these areas with new sections
Read more about Gas Street Bridge Birmingham
Filed Under:
HeritageDecember 20th, 2009
Metalock Engineering UK has used its cold repair expertise to repair and refurbish parapet panels, copings and cornices on the Old West Bridge in Leicester.
Read more about Old West Bridge in Leicester
Filed Under:
HeritageDecember 5th, 2009
The Palm House forms an integral part of the structure of Kew Gardens, and is being renovated as part of the overall restoration programme. The sills, guttering and floor plates,
Filed Under:
HeritageNovember 30th, 2009
During refurbishment at Somerset House, inspection to the Main Support Girders showed extensive fractures. These fractures were repaired using a combination of Masterlocks and Metalock Keys, giving additional strength to
Read more about Somerset House Main Girder Repair
PRESS RELEASE
November 12th, 2009
Metalock Engineering UK has recently carried out intricate on-site machining on two LP turbines at Drax power station to enable Siemens retrofits and upgrades which will improve output and give
Read more about Drax Power Station
Contact:
Metalock Engineering UK Ltd.
Unit H5 Pilgrims Walk, Prologis Park, Coventry CV6 4QG ENGLAND
Tel: +44 (0) 2476 338205
Fax: +44 (0) 2476 360190