Filed Under:
HeritageMarch 1st, 2010


A famous landmark in Central London, the 100 year old Charing Cross Bridge carries 123,000 commuters across the Thames by rail each day. 720 feet of cracks to the structure’s sixteen cast iron columns were successfully repaired by the Metalock process with 108,000 drillings and 36,000 tappings performed on site – without disruption to rail services.
Filed Under:
HeritageFebruary 10th, 2010
Broken cast iron lips that hold parapet panels in place on a grade 11 listed railway bridge at Codsall in South Staffordshire have been repaired by Metalock Engineering.
Read more about Codsall Railway Bridge
Filed Under:
HeritageNovember 19th, 2009
Railway platform Support Column fractures due to frost and repaired on-site by Metalock Engineering UK.
Read more about Railway Platform Support Column